CLIENT: NEWMONT GOLD GHANA LTD
Scope of services
Erection of integrated facility building:
- 25m* 66 * 9 high workshop/warehouse
- 80 tons of structural steel installed
- 3000 sq m cladding and roofing
- 25t overhead crane and runway installation
Construction of CCD Bridge:
- Fabrication of 20tons of steel
- Surface preparation and painting
- Erection and commissioning
Installation of Emergency Power Generators:
- Fabrication and installation of cable tray supports and pipe
- Supports, piping, welding, surface preparation and painting
- Installation of Generators, cooling towers, exhaust systems
CLIENT: TAKORADI THERMAL POWER STATION
Scope of services
Rust control works:
- Surface Preparation and coating of over 100 sq m using:
- Painting systems and coating products from Akzo Intl
- Manual/Mechanical surface preparation/sandblasting of 50 m high bypass stack
Construction of 50 ft Bridge Crane and 100 m runway:
- Excavations for foundations
- Erection of re-inforced concrete pedestals
- Assembly and erection of 18m runway support
- Erection of 50 ton overhead crane
CLIENT: AHAFO GOLD PROJECT (Newmont Gold Ghana Ltd)
Scope of services
Concrete Works in fence foundation:
- Installation of 16000km of high security fencing
- Erection of heavy equipments workshop building
- Erection of truck workdown facilities
- Electrical installation of overhead cranes, roller shutter doors